11MW Ground Mount Solar Installation in Lancaster

Lancaster Solar Installation

Project Overview

In late 2024, Gridfit successfully delivered an 11MW ground mount solar installation for ALT-Group in Lancaster. The project, spread across six zones, is another project supporting the UK’s transition to renewable energy.   

Client & Project Scope

ALT-Group, a forward-thinking energy solutions provider, sought a reliable partner to install a high-capacity ground mount solar system. The primary objectives included:

  • Efficiently harnessing solar energy to reduce reliance on non-renewable power sources.
  • Ensuring rapid deployment while maintaining high installation standards.
  • Delivering long-term cost savings and sustainability benefits to the client.

Challenges & Solutions

  1. Site Conditions & Planning
    The project site featured varied terrain and environmental considerations. Gridfit conducted detailed assessments to optimise panel placement and ensure maximum solar yield. A tailored ground mounting solution was implemented to adapt to site-specific conditions.
  2. Efficient Execution & Timeline
    Gridfit’s experienced team worked to complete the project in six phases, with two zones reaching completion ahead of schedule. Despite challenging weather conditions during winter months, our team met the deadline, ensuring the system was operational before the end of 2024.
  3. Seamless Integration & Performance
    The high-capacity setup integrates seamlessly with existing grid infrastructure, maximising energy output while minimizing operational downtime.

Results & Impact

  • 11MW of clean energy is now actively contributing to the grid, reducing carbon footprint.
  • Significant energy cost savings projected for the client over the system’s lifespan.
  • Strengthened sustainability credentials for the client, enhancing their ESG (Environmental, Social, Governance) initiatives.

Conclusion

The Lancaster 11MW project is a testament to Gridfit’s expertise in delivering large-scale renewable energy solutions. From initial planning to final commissioning, our team’s dedication ensured a seamless transition to clean energy for ALT-Group’s client.

Jack Marshall

28th March, 2025